mechanical preconstruction
What is Mechanical Preconstruction?
Mechanical precon involves a process of analyzing the design intent, scopes of work, analyzing specifications and analyzing drawings. Which provides information to the develop of the Mechanical estimate and proposal which are based on an Clients/Owner's/Engineer's design intent through construction documents.
Mechanical precon involves a process of analyzing the design intent, scopes of work, analyzing specifications and analyzing drawings. Which provides information to the develop of the Mechanical estimate and proposal which are based on an Clients/Owner's/Engineer's design intent through construction documents.
What is Mechanical Preconstruction VE? It is the phase when overall mechanical project saving can be achieved. Through understanding of Value Engineering (VE) is not a design/peer review or a cost-cutting exercise. VE is a creative, organized effort, which analyzes the requirements of a project for the purpose of achieving the essential functions at the lowest total costs (capital, staffing, energy, maintenance) over the life of the project. Through a group investigation, using experienced, multi-disciplinary teams, value and economy are improved through the study of alternate design concepts, materials, and methods without compromising the functional and value objectives of the client.
Mechanical Construction Sessions
Join one of my Mechanical sessions where I pull back the curtain and expose all the trade secretes.
We get deep into the details of each session and share with you the core make-up of each session.
Each session runs for 4 hours. Contact us today for dates and details.
Join one of my Mechanical sessions where I pull back the curtain and expose all the trade secretes.
We get deep into the details of each session and share with you the core make-up of each session.
Each session runs for 4 hours. Contact us today for dates and details.
Session MCE-1
MEPS Construction Estimating Develop a Buildable Estimate Produce a detailed, accurate and professional estimates is a result of knowing how to piece specific elements together, working with material suppliers for accurate material pricing and knowing the market conditions. Session MBL-3
MEPS Budgeting with Limited Info. Mechanical budgeting on the Fly Grasping what information is important vs info that is not at this stage. Understanding how to develop detail from limited info. Session AME-5
Advance Mechanical Estimating Advance Mechanical Estimating Techniques From start to finish, we get deep into the challenges every Mechanical Estimator deals with. We breakdown challenges and make them less challenging. |
Session MPCP-2
MEPS Project Controls - Preconstruction Removing Waste by Monitoring Precon Cost Review all requests, drawings and specs to verify, negotiate, validate upgrade and betterment requests. Make sure the request is accurately priced and not already included in the original scope and the original material gets credited if there is a change. Understanding how each widget benefits the project or does not offer any value. Session MDD-4
MEPS Design Development Stages, DD to CD Expert Design Constructability Analysis Understanding the design intent is steady evolving and moving along. The need to track all communications related to the design and communicate with all the proper parties for seemly understanding and agreement on the design and the intents. Interpretations of the Mechanical design. |
Session MEPS-CM 6.2.0
Advance MEPS Construction Management
Expert MEPS Construction Management Techniques
Understanding the key elements on MEPS Construction Management.
The MEPS design and the Trajectory from DD to buy out and build.
We share the most compelling facts and strategies on how to keep the MEPS on schedule and inline with the budget.
This is an advance session. Please email for course questionnaire and summary.
Advance MEPS Construction Management
Expert MEPS Construction Management Techniques
Understanding the key elements on MEPS Construction Management.
The MEPS design and the Trajectory from DD to buy out and build.
We share the most compelling facts and strategies on how to keep the MEPS on schedule and inline with the budget.
This is an advance session. Please email for course questionnaire and summary.